{"id":13753,"date":"2022-03-24T17:43:13","date_gmt":"2022-03-24T16:43:13","guid":{"rendered":"https:\/\/2025.mining-report.de\/english\/?p=13753"},"modified":"2022-03-24T17:43:13","modified_gmt":"2022-03-24T16:43:13","slug":"bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal","status":"publish","type":"post","link":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/","title":{"rendered":"Bauer constructs cut-off wall for hydroelectric power plant in Nepal"},"content":{"rendered":"<p><strong>Sankhuwasabha District, Nepal<\/strong> \u2013 The Arun River in Nepal flows from Tibet through the Himalayas into China. Of all Nepalese river basins, it has the largest area covered in snow and ice. A new hydroelectric power plant is currently being constructed on this river, and it is expected to produce up to 900 MW of electricity.<\/p>\n<p>BAUER Engineering India Pvt. Ltd., a subsidiary of BAUER Spezialtiefbau GmbH, was tasked by the Indian company Jaiprakash Associates Limited with the construction of a cut-off wall as part of the project Arun III HEP. The goal is to achieve a seal and reduce seepage water below the upstream cofferdam and in the left and right abutments.<\/p>\n<p>The scope of service provided by Bauer includes the execution of 3,500 running meters of drilling and injection work on the cofferdam. In the granular construction soil, composed of sand, gravel, rubble and boulders, the pore injections are executed by means of tube-\u00e0-manchette and annular grouting.<\/p>\n<p><a href=\"https:\/\/2025.mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2022\/03\/FN_01_BAUER_dichtwand_nepal.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-13752 size-medium\" src=\"https:\/\/2025.mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2022\/03\/FN_01_BAUER_dichtwand_nepal-214x300.jpg\" alt=\"\" width=\"214\" height=\"300\" srcset=\"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2022\/03\/FN_01_BAUER_dichtwand_nepal-214x300.jpg 214w, https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2022\/03\/FN_01_BAUER_dichtwand_nepal-600x840.jpg 600w, https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2022\/03\/FN_01_BAUER_dichtwand_nepal.jpg 620w\" sizes=\"auto, (max-width: 214px) 100vw, 214px\" \/><\/a>\u201cUsing the pore injections, we are able to fill the pores in the very loose soil with cement slurry and thereby reduce its permeability\u201d, explains Project Manager Satish Kumar. He continues: \u201cInjections require a high degree of quality assurance and quality control. We are able to meet the strict demands thanks to our many years of experience.\u201d In addition to the pore injections, Bauer will also carry out rock grouting in order to fill gaps, fractures and cavities in the rock.<\/p>\n<p>Due to the remote location in the Himalayas, not only the construction soil poses a challenge, but also logistics. On top of that, the schedule is very tight: this is because snow starts to melt in March, causing the water level in the river to rise and making work more difficult.<\/p>\n<p>A KLEMM KR 909 is being used for the drilling and injection work. The work executed by Bauer started in December 2021 and is expected to be completed by May 2022.<\/p>\n<p>Further information:<br \/>\nBAUER AG<br \/>\n<a href=\"https:\/\/www.bauer.de\/bauer_group\/index.html\" target=\"_blank\" rel=\"noopener\">www.bauer.de<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sankhuwasabha District, Nepal \u2013 The Arun River in Nepal flows from Tibet through the Himalayas into China. Of all Nepalese river basins, it has the largest area covered in snow &hellip;<\/p>\n","protected":false},"author":25,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[856],"tags":[275,838],"class_list":["post-13753","post","type-post","status-publish","format-standard","hentry","category-industry-news-issue-01_2022","tag-bauer-ag","tag-bauer-maschinen-gmbh"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bauer constructs cut-off wall for hydroelectric power plant in Nepal - MINING REPORT<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bauer constructs cut-off wall for hydroelectric power plant in Nepal - MINING REPORT\" \/>\n<meta property=\"og:description\" content=\"Sankhuwasabha District, Nepal \u2013 The Arun River in Nepal flows from Tibet through the Himalayas into China. Of all Nepalese river basins, it has the largest area covered in snow &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/\" \/>\n<meta property=\"og:site_name\" content=\"MINING REPORT\" \/>\n<meta property=\"article:published_time\" content=\"2022-03-24T16:43:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/2025.mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2022\/03\/FN_01_BAUER_dichtwand_nepal-214x300.jpg\" \/>\n<meta name=\"author\" content=\"Redaktion\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redaktion\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"TechArticle\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\\\/\"},\"author\":{\"name\":\"Redaktion\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/50dbf1509042c13292b2b695bfa519a0\"},\"headline\":\"Bauer constructs cut-off wall for hydroelectric power plant in Nepal\",\"datePublished\":\"2022-03-24T16:43:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\\\/\"},\"wordCount\":334,\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/2025.mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2022\\\/03\\\/FN_01_BAUER_dichtwand_nepal-214x300.jpg\",\"keywords\":[\"BAUER AG\",\"BAUER Maschinen GmbH\"],\"articleSection\":[\"Industry News 01_2022\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\\\/\",\"name\":\"Bauer constructs cut-off wall for hydroelectric power plant in Nepal - MINING REPORT\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/2025.mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2022\\\/03\\\/FN_01_BAUER_dichtwand_nepal-214x300.jpg\",\"datePublished\":\"2022-03-24T16:43:13+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\\\/#primaryimage\",\"url\":\"https:\\\/\\\/2025.mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2022\\\/03\\\/FN_01_BAUER_dichtwand_nepal-214x300.jpg\",\"contentUrl\":\"https:\\\/\\\/2025.mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2022\\\/03\\\/FN_01_BAUER_dichtwand_nepal-214x300.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bauer constructs cut-off wall for hydroelectric power plant in Nepal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"name\":\"MINING REPORT\",\"description\":\"english Edition\",\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mining-report.de\\\/english\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\",\"name\":\"Mining Report\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"contentUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"width\":830,\"height\":198,\"caption\":\"Mining Report\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/50dbf1509042c13292b2b695bfa519a0\",\"name\":\"Redaktion\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/author\\\/herrwolfgang\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bauer constructs cut-off wall for hydroelectric power plant in Nepal - MINING REPORT","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/","og_locale":"en_US","og_type":"article","og_title":"Bauer constructs cut-off wall for hydroelectric power plant in Nepal - MINING REPORT","og_description":"Sankhuwasabha District, Nepal \u2013 The Arun River in Nepal flows from Tibet through the Himalayas into China. Of all Nepalese river basins, it has the largest area covered in snow &hellip;","og_url":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/","og_site_name":"MINING REPORT","article_published_time":"2022-03-24T16:43:13+00:00","og_image":[{"url":"https:\/\/2025.mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2022\/03\/FN_01_BAUER_dichtwand_nepal-214x300.jpg","type":"","width":"","height":""}],"author":"Redaktion","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redaktion","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"TechArticle","@id":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/#article","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/"},"author":{"name":"Redaktion","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/50dbf1509042c13292b2b695bfa519a0"},"headline":"Bauer constructs cut-off wall for hydroelectric power plant in Nepal","datePublished":"2022-03-24T16:43:13+00:00","mainEntityOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/"},"wordCount":334,"publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/#primaryimage"},"thumbnailUrl":"https:\/\/2025.mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2022\/03\/FN_01_BAUER_dichtwand_nepal-214x300.jpg","keywords":["BAUER AG","BAUER Maschinen GmbH"],"articleSection":["Industry News 01_2022"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/","url":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/","name":"Bauer constructs cut-off wall for hydroelectric power plant in Nepal - MINING REPORT","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/#primaryimage"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/#primaryimage"},"thumbnailUrl":"https:\/\/2025.mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2022\/03\/FN_01_BAUER_dichtwand_nepal-214x300.jpg","datePublished":"2022-03-24T16:43:13+00:00","breadcrumb":{"@id":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/#primaryimage","url":"https:\/\/2025.mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2022\/03\/FN_01_BAUER_dichtwand_nepal-214x300.jpg","contentUrl":"https:\/\/2025.mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2022\/03\/FN_01_BAUER_dichtwand_nepal-214x300.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/mining-report.de\/english\/blog\/bauer-constructs-cut-off-wall-for-hydroelectric-power-plant-in-nepal\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mining-report.de\/english\/"},{"@type":"ListItem","position":2,"name":"Bauer constructs cut-off wall for hydroelectric power plant in Nepal"}]},{"@type":"WebSite","@id":"https:\/\/mining-report.de\/english\/#website","url":"https:\/\/mining-report.de\/english\/","name":"MINING REPORT","description":"english Edition","publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mining-report.de\/english\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mining-report.de\/english\/#organization","name":"Mining Report","url":"https:\/\/mining-report.de\/english\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/","url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","contentUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","width":830,"height":198,"caption":"Mining Report"},"image":{"@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/50dbf1509042c13292b2b695bfa519a0","name":"Redaktion","url":"https:\/\/mining-report.de\/english\/blog\/author\/herrwolfgang\/"}]}},"_links":{"self":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/13753","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/comments?post=13753"}],"version-history":[{"count":1,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/13753\/revisions"}],"predecessor-version":[{"id":13754,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/13753\/revisions\/13754"}],"wp:attachment":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/media?parent=13753"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/categories?post=13753"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/tags?post=13753"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}