{"id":19214,"date":"2025-01-31T18:14:28","date_gmt":"2025-01-31T17:14:28","guid":{"rendered":"https:\/\/2025.mining-report.de\/english\/?p=19214"},"modified":"2025-01-31T18:16:09","modified_gmt":"2025-01-31T17:16:09","slug":"gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia","status":"publish","type":"post","link":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/","title":{"rendered":"Gigantic dimensions: Bauer Spezialtiefbau executes XXL diaphragm wall shaft in Slovenia"},"content":{"rendered":"<p>How to dispose of waste? This question is not only the subject of discussion on a small scale, but also represents a challenge at the national level \u2013 especially when it comes to radioactive waste. The town of Kr\u0161ko in eastern Slovenia is the focus of a major project: the construction of a repository for low- and intermediate-level radioactive waste. The Slovenian Agency for Radioactive Waste Management (ARAO) has tasked a consortium led by Riko d.o.o. of Ljubljana, together with Kolektor CPG of Nova Gorica, CGP of Novo mesto and Kostak d.d. of Kr\u0161ko, to carry out the construction work. Trial operation of the facility is planned in 2028.<\/p>\n<figure id=\"attachment_19215\" aria-describedby=\"caption-attachment-19215\" style=\"width: 620px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/2025.mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/01\/FN_3_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-19215\" src=\"https:\/\/2025.mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/01\/FN_3_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft.jpg\" alt=\"\" width=\"620\" height=\"330\" srcset=\"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/01\/FN_3_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft.jpg 620w, https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/01\/FN_3_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft-300x160.jpg 300w, https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/01\/FN_3_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft-600x319.jpg 600w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/a><figcaption id=\"caption-attachment-19215\" class=\"wp-caption-text\">The BAUER Cutter Inclination System (CIS)<sup>\u00ae<\/sup> ensures precise positioning of the diaphragm walls. Photo: Bauer Spezialtiefbau<\/figcaption><\/figure>\n<p><strong>6,500 m<sup>2<\/sup> of diaphragm wall installed up to depth of 65 m<\/strong><\/p>\n<p>A key component of the project is the circular diaphragm wall shaft that was constructed by BAUER Spezialtiefbau GmbH. With a diameter of 32 m, a depth of 65 m and a wall thickness of 1.5 m, the structure extends over an impressive area of 6,500 m\u00b2. To achieve this challenging task, the specialist foundation engineering experts used a BAUER MC 96 duty-cycle crane with a BC 48 trench cutter and an MC 64 with hydraulic grab DHG\/V. Also employed: the BAUER Cutter Inclination System (CIS)<sup>\u00ae<\/sup> for precise positioning of the diaphragm walls, as well as the Hydraulic Grab Inclination System (HGIS)<sup>\u00ae<\/sup> for continuous monitoring and control of the hydraulic grab.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Digital tools for sustainability and quality<\/strong><\/p>\n<p>In order to manage the complexity of this large-scale project, the experienced team used digital tools for process optimization and lean management, key elements of the BAUER Construction Process. Thanks to detailed engineering, control and monitoring of all construction phases, it was possible to maintain optimal use of resources and the highest quality standards. \u201cWith our technology and decades of expertise, we are setting standards for geotechnical precision. By using our thoroughly tried-and-tested diaphragm wall equipment on the one hand, and advanced digital systems on the other, we are able to meet even the strictest accuracy requirements while ensuring optimally sustainable design,\u201d explains Project Manager Stefan Neidhart.<\/p>\n<p>Right from the start of diaphragm wall work on October 1, 2024, the crew from Bauer Spezialtiefbau showed full commitment. \u201cThanks to our dedicated team and state-of-the-art technologies, we have made a crucial contribution to this major project,\u201d explains the project manager. The construction of the diaphragm walls was successfully completed in December 2024.<\/p>\n<p>Further information:<br \/>\nBAUER AG<br \/>\n<a href=\"https:\/\/www.bauer.de\/en\" target=\"_blank\" rel=\"noopener\">www.bauer.de<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>How to dispose of waste? This question is not only the subject of discussion on a small scale, but also represents a challenge at the national level \u2013 especially when &hellip;<\/p>\n","protected":false},"author":25,"featured_media":19217,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1017],"tags":[275,541],"class_list":["post-19214","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news-01_2025","tag-bauer-ag","tag-bauer-spezialtiefbau-gmbh"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gigantic dimensions: Bauer Spezialtiefbau executes XXL diaphragm wall shaft in Slovenia - MINING REPORT<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gigantic dimensions: Bauer Spezialtiefbau executes XXL diaphragm wall shaft in Slovenia - MINING REPORT\" \/>\n<meta property=\"og:description\" content=\"How to dispose of waste? This question is not only the subject of discussion on a small scale, but also represents a challenge at the national level \u2013 especially when &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/\" \/>\n<meta property=\"og:site_name\" content=\"MINING REPORT\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-31T17:14:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-31T17:16:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/01\/FN_1_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"330\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Redaktion\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redaktion\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"TechArticle\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\\\/\"},\"author\":{\"name\":\"Redaktion\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/50dbf1509042c13292b2b695bfa519a0\"},\"headline\":\"Gigantic dimensions: Bauer Spezialtiefbau executes XXL diaphragm wall shaft in Slovenia\",\"datePublished\":\"2025-01-31T17:14:28+00:00\",\"dateModified\":\"2025-01-31T17:16:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\\\/\"},\"wordCount\":433,\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/01\\\/FN_1_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft.jpg\",\"keywords\":[\"BAUER AG\",\"BAUER Spezialtiefbau GmbH\"],\"articleSection\":[\"Industry News 01_2025\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\\\/\",\"name\":\"Gigantic dimensions: Bauer Spezialtiefbau executes XXL diaphragm wall shaft in Slovenia - MINING REPORT\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/01\\\/FN_1_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft.jpg\",\"datePublished\":\"2025-01-31T17:14:28+00:00\",\"dateModified\":\"2025-01-31T17:16:09+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\\\/#primaryimage\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/01\\\/FN_1_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft.jpg\",\"contentUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/01\\\/FN_1_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft.jpg\",\"width\":620,\"height\":330,\"caption\":\"Over an impressive area of 6,500 m2, the experts from Bauer Spezialtiefbau constructed a shaft 32 m wide and 65 m deep. Photo: Bauer Spezialtiefbau\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gigantic dimensions: Bauer Spezialtiefbau executes XXL diaphragm wall shaft in Slovenia\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"name\":\"MINING REPORT\",\"description\":\"english Edition\",\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mining-report.de\\\/english\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\",\"name\":\"Mining Report\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"contentUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"width\":830,\"height\":198,\"caption\":\"Mining Report\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/50dbf1509042c13292b2b695bfa519a0\",\"name\":\"Redaktion\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/author\\\/herrwolfgang\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gigantic dimensions: Bauer Spezialtiefbau executes XXL diaphragm wall shaft in Slovenia - MINING REPORT","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/","og_locale":"en_US","og_type":"article","og_title":"Gigantic dimensions: Bauer Spezialtiefbau executes XXL diaphragm wall shaft in Slovenia - MINING REPORT","og_description":"How to dispose of waste? This question is not only the subject of discussion on a small scale, but also represents a challenge at the national level \u2013 especially when &hellip;","og_url":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/","og_site_name":"MINING REPORT","article_published_time":"2025-01-31T17:14:28+00:00","article_modified_time":"2025-01-31T17:16:09+00:00","og_image":[{"width":620,"height":330,"url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/01\/FN_1_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft.jpg","type":"image\/jpeg"}],"author":"Redaktion","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redaktion","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"TechArticle","@id":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/#article","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/"},"author":{"name":"Redaktion","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/50dbf1509042c13292b2b695bfa519a0"},"headline":"Gigantic dimensions: Bauer Spezialtiefbau executes XXL diaphragm wall shaft in Slovenia","datePublished":"2025-01-31T17:14:28+00:00","dateModified":"2025-01-31T17:16:09+00:00","mainEntityOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/"},"wordCount":433,"publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/#primaryimage"},"thumbnailUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/01\/FN_1_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft.jpg","keywords":["BAUER AG","BAUER Spezialtiefbau GmbH"],"articleSection":["Industry News 01_2025"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/","url":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/","name":"Gigantic dimensions: Bauer Spezialtiefbau executes XXL diaphragm wall shaft in Slovenia - MINING REPORT","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/#primaryimage"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/#primaryimage"},"thumbnailUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/01\/FN_1_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft.jpg","datePublished":"2025-01-31T17:14:28+00:00","dateModified":"2025-01-31T17:16:09+00:00","breadcrumb":{"@id":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/#primaryimage","url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/01\/FN_1_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft.jpg","contentUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/01\/FN_1_bauer-spezialtiefbau_krsko-slovenia-diaphragm-wall-shaft.jpg","width":620,"height":330,"caption":"Over an impressive area of 6,500 m2, the experts from Bauer Spezialtiefbau constructed a shaft 32 m wide and 65 m deep. Photo: Bauer Spezialtiefbau"},{"@type":"BreadcrumbList","@id":"https:\/\/mining-report.de\/english\/blog\/gigantic-dimensions-bauer-spezialtiefbau-executes-xxl-diaphragm-wall-shaft-in-slovenia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mining-report.de\/english\/"},{"@type":"ListItem","position":2,"name":"Gigantic dimensions: Bauer Spezialtiefbau executes XXL diaphragm wall shaft in Slovenia"}]},{"@type":"WebSite","@id":"https:\/\/mining-report.de\/english\/#website","url":"https:\/\/mining-report.de\/english\/","name":"MINING REPORT","description":"english Edition","publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mining-report.de\/english\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mining-report.de\/english\/#organization","name":"Mining Report","url":"https:\/\/mining-report.de\/english\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/","url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","contentUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","width":830,"height":198,"caption":"Mining Report"},"image":{"@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/50dbf1509042c13292b2b695bfa519a0","name":"Redaktion","url":"https:\/\/mining-report.de\/english\/blog\/author\/herrwolfgang\/"}]}},"_links":{"self":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/19214","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/comments?post=19214"}],"version-history":[{"count":3,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/19214\/revisions"}],"predecessor-version":[{"id":19220,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/19214\/revisions\/19220"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/media\/19217"}],"wp:attachment":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/media?parent=19214"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/categories?post=19214"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/tags?post=19214"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}