{"id":20687,"date":"2025-12-08T17:12:40","date_gmt":"2025-12-08T16:12:40","guid":{"rendered":"https:\/\/2025.mining-report.de\/english\/?p=20687"},"modified":"2025-12-08T17:13:29","modified_gmt":"2025-12-08T16:13:29","slug":"westkalk-invests-3-m-euro-in-warstein","status":"publish","type":"post","link":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/","title":{"rendered":"WESTKALK invests 3 M \u20ac in Warstein"},"content":{"rendered":"<p>WESTKALK Vereinigte Warsteiner Kalksteinindustrie GmbH &amp; Co. KG, Warstein\/Germany, is currently investing 3 M \u20ac in state-of-the-art electrical engineering at its Warstein site (Figure 1). Transformers, switchgear, switch cabinets, relays and power supplies have been gradually replaced since spring 2025. The project is scheduled for completion at the end of 2026. The work is being carried out by the specialist company Decker from Brilon\/Germany.<\/p>\n<p>The reason for this is the ageing switchgear technology from the 1980s. Switches and relays are worn out and cable contacts are brittle. It is becoming increasingly difficult to procure spare parts. The procurement of transformers in particular is taking time: Electrical components are needed everywhere to shape the energy transition, which is reflected in long delivery times. WESTKALK has ordered five new transformers.<\/p>\n<p>WESTKALK\u2019s electricity requirements are considerable. The primary crusher alone requires 400 KW (approximately 600\u00a0hp) of power. Added to this are the dust extraction systems and conveyor belts: Everything at WESTKALK is powered by electricity. This requires a voltage of 400\u00a0V three-phase current. However, 10,000 V (known as medium voltage) is supplied, which is then stepped down. The company needs its own transformers for this. Suitable housings for this will be delivered shortly, weighing up to 60\u00a0t and, due to their extra width of approximately 3\u00a0m, can only be transported at night by low-loader.<\/p>\n<p>State-of-the-art technology is being installed. The switches and relays, e.\u2009g., are encapsulated with a special protective gas to minimise the arc effect during switching. Sulphur hexafluoride (SF6) is no longer used for this purpose. Instead, Siemens\u2019 particularly environmentally friendly Clean Air process is employed. This insulating medium consists exclusively of natural components of the ambient air, such as nitrogen or oxygen.<\/p>\n<p>In future, WESTKALK intends to become self-sufficient in terms of its power supply. Approximately 1.5\u00a0MW is required on a regular basis. An appropriately sized, environmentally friendly photovoltaic system is in the planning stage. (WESTKALK\/Si.)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WESTKALK Vereinigte Warsteiner Kalksteinindustrie GmbH &amp; Co. KG, Warstein\/Germany, is currently investing 3 M \u20ac in state-of-the-art electrical engineering at its Warstein site (Figure 1). Transformers, switchgear, switch cabinets, relays &hellip;<\/p>\n","protected":false},"author":25,"featured_media":20683,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1066],"tags":[677],"class_list":["post-20687","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-in-brief-06_2025","tag-westkalk"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>WESTKALK invests 3 M \u20ac in Warstein - MINING REPORT<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"WESTKALK invests 3 M \u20ac in Warstein - MINING REPORT\" \/>\n<meta property=\"og:description\" content=\"WESTKALK Vereinigte Warsteiner Kalksteinindustrie GmbH &amp; Co. KG, Warstein\/Germany, is currently investing 3 M \u20ac in state-of-the-art electrical engineering at its Warstein site (Figure 1). Transformers, switchgear, switch cabinets, relays &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/\" \/>\n<meta property=\"og:site_name\" content=\"MINING REPORT\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-08T16:12:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-08T16:13:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/12\/KN_1_westkalk_produktion.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"940\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Redaktion\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redaktion\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"TechArticle\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/westkalk-invests-3-m-euro-in-warstein\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/westkalk-invests-3-m-euro-in-warstein\\\/\"},\"author\":{\"name\":\"Redaktion\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/50dbf1509042c13292b2b695bfa519a0\"},\"headline\":\"WESTKALK invests 3 M \u20ac in Warstein\",\"datePublished\":\"2025-12-08T16:12:40+00:00\",\"dateModified\":\"2025-12-08T16:13:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/westkalk-invests-3-m-euro-in-warstein\\\/\"},\"wordCount\":319,\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/westkalk-invests-3-m-euro-in-warstein\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/12\\\/KN_1_westkalk_produktion.jpg\",\"keywords\":[\"WESTKALK\"],\"articleSection\":[\"News in Brief 06_2025\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/westkalk-invests-3-m-euro-in-warstein\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/westkalk-invests-3-m-euro-in-warstein\\\/\",\"name\":\"WESTKALK invests 3 M \u20ac in Warstein - MINING REPORT\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/westkalk-invests-3-m-euro-in-warstein\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/westkalk-invests-3-m-euro-in-warstein\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/12\\\/KN_1_westkalk_produktion.jpg\",\"datePublished\":\"2025-12-08T16:12:40+00:00\",\"dateModified\":\"2025-12-08T16:13:29+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/westkalk-invests-3-m-euro-in-warstein\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/westkalk-invests-3-m-euro-in-warstein\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/westkalk-invests-3-m-euro-in-warstein\\\/#primaryimage\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/12\\\/KN_1_westkalk_produktion.jpg\",\"contentUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2025\\\/12\\\/KN_1_westkalk_produktion.jpg\",\"width\":940,\"height\":500,\"caption\":\"Fig. 1. Blasting in a WESTKALK quarry. Source: WESTKALK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/westkalk-invests-3-m-euro-in-warstein\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"WESTKALK invests 3 M \u20ac in Warstein\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"name\":\"MINING REPORT\",\"description\":\"english Edition\",\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mining-report.de\\\/english\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\",\"name\":\"Mining Report\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"contentUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"width\":830,\"height\":198,\"caption\":\"Mining Report\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/50dbf1509042c13292b2b695bfa519a0\",\"name\":\"Redaktion\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/author\\\/herrwolfgang\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"WESTKALK invests 3 M \u20ac in Warstein - MINING REPORT","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/","og_locale":"en_US","og_type":"article","og_title":"WESTKALK invests 3 M \u20ac in Warstein - MINING REPORT","og_description":"WESTKALK Vereinigte Warsteiner Kalksteinindustrie GmbH &amp; Co. KG, Warstein\/Germany, is currently investing 3 M \u20ac in state-of-the-art electrical engineering at its Warstein site (Figure 1). Transformers, switchgear, switch cabinets, relays &hellip;","og_url":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/","og_site_name":"MINING REPORT","article_published_time":"2025-12-08T16:12:40+00:00","article_modified_time":"2025-12-08T16:13:29+00:00","og_image":[{"width":940,"height":500,"url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/12\/KN_1_westkalk_produktion.jpg","type":"image\/jpeg"}],"author":"Redaktion","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redaktion","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"TechArticle","@id":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/#article","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/"},"author":{"name":"Redaktion","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/50dbf1509042c13292b2b695bfa519a0"},"headline":"WESTKALK invests 3 M \u20ac in Warstein","datePublished":"2025-12-08T16:12:40+00:00","dateModified":"2025-12-08T16:13:29+00:00","mainEntityOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/"},"wordCount":319,"publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/#primaryimage"},"thumbnailUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/12\/KN_1_westkalk_produktion.jpg","keywords":["WESTKALK"],"articleSection":["News in Brief 06_2025"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/","url":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/","name":"WESTKALK invests 3 M \u20ac in Warstein - MINING REPORT","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/#primaryimage"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/#primaryimage"},"thumbnailUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/12\/KN_1_westkalk_produktion.jpg","datePublished":"2025-12-08T16:12:40+00:00","dateModified":"2025-12-08T16:13:29+00:00","breadcrumb":{"@id":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/#primaryimage","url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/12\/KN_1_westkalk_produktion.jpg","contentUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2025\/12\/KN_1_westkalk_produktion.jpg","width":940,"height":500,"caption":"Fig. 1. Blasting in a WESTKALK quarry. Source: WESTKALK"},{"@type":"BreadcrumbList","@id":"https:\/\/mining-report.de\/english\/blog\/westkalk-invests-3-m-euro-in-warstein\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mining-report.de\/english\/"},{"@type":"ListItem","position":2,"name":"WESTKALK invests 3 M \u20ac in Warstein"}]},{"@type":"WebSite","@id":"https:\/\/mining-report.de\/english\/#website","url":"https:\/\/mining-report.de\/english\/","name":"MINING REPORT","description":"english Edition","publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mining-report.de\/english\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mining-report.de\/english\/#organization","name":"Mining Report","url":"https:\/\/mining-report.de\/english\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/","url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","contentUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","width":830,"height":198,"caption":"Mining Report"},"image":{"@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/50dbf1509042c13292b2b695bfa519a0","name":"Redaktion","url":"https:\/\/mining-report.de\/english\/blog\/author\/herrwolfgang\/"}]}},"_links":{"self":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/20687","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/comments?post=20687"}],"version-history":[{"count":2,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/20687\/revisions"}],"predecessor-version":[{"id":20689,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/20687\/revisions\/20689"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/media\/20683"}],"wp:attachment":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/media?parent=20687"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/categories?post=20687"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/tags?post=20687"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}