{"id":5684,"date":"2017-08-21T14:14:28","date_gmt":"2017-08-21T12:14:28","guid":{"rendered":"https:\/\/2025.mining-report.de\/english\/?p=5684"},"modified":"2017-08-21T17:34:43","modified_gmt":"2017-08-21T15:34:43","slug":"foundation-stone-laid-expansion-power-facilities-tu-darmstadt","status":"publish","type":"post","link":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/","title":{"rendered":"Foundation stone laid for the expansion of power facilities at TU Darmstadt"},"content":{"rendered":"<p>A new building is being added to the power facilities at the Technical University of Darmstadt\/Germany. It will house a complex air conditioning system and a highly efficient small-scale combined heat and power unit (CHP). The foundation stone was laid in a ceremony which took place on 12th May 2017 (Image 1). TU Darmstadt is currently supplied with heat, air conditioning and power under a long-term contracting agreement with project company ENTEGA STEAG W\u00e4rme GmbH, which was concluded last year. Important elements of the agreement include expansion of the TU Darmstadt power networks, modernisation of the existing CHP unit and setup of a new technical building directly on the Lichtwiese campus.<\/p>\n<p>Covering an area of roughly 600 m<sup>2<\/sup> and at 11 m tall, the new building will be completed by 2018 and fitted with two \u201ccentrepieces\u201d \u2013 a small-scale CHP unit with an electrical output of approximately 3 MW and a modern air conditioning system. For the air conditioning, an absorption refrigeration machine (refrigerating capacity 1 MW) must first be installed, which makes it possible to generate cool air using thermal energy from the CHP unit in a particularly environmentally friendly manner. In future, this air will then be fed into the roughly 3 km long closed circuit network currently being constructed on the Lichtwiese campus, and will cool facilities such as the Lichtenberg supercomputer and the technical laboratory infrastructure in the Chemistry department. Another step in the future development of the Lichtwiese campus is planned to take place at a later stage, and will involve installing a second absorption refrigeration machine, this time with a capacity of 2 MW.<\/p>\n<p>ENTEGA STEAG W\u00e4rme GmbH, based in Darmstadt, was founded to finance, expand and operate all the power facilities, and is investing around 14 m \u20ac\u00a0in the heating and air conditioning infrastructure over the course of this year and the next. The total sum of investment stands at 17 m \u20ac .<\/p>\n<p>\u201cThis construction project is another milestone in the ecological and economically responsible expansion of the university\u2019s infrastructure,\u201d said TU President Prof. Hans J\u00fcrgen Pr\u00f6mel. \u201cThe new power facilities will make a considerable contribution to securing a long-term, future-proof and viable energy supply for TU Darmstadt and many more properties in the district.\u201d Pr\u00f6mel added that the university\u2019s project is directly supporting the federal state\u2019s climate protection goals (\u201cCO<sub>2<\/sub>-neutral state administration\u201d). According to him, the new power facilities will ultimately be \u201csuperbly incorporated into the \u2018Energy-efficient Licht-wiese campus\u2019 project \u2013 an interdisciplinary project funded by the federal government \u2013 as a subject of study.\u201d<\/p>\n<p>The expansion of the power facilities is being accompanied by the connection of the TU Darmstadt district heating grid to that of the Darmstadt Nord district. Thanks to this connection, around 30,000 MWh of heat from the waste-to-energy plant will be fed into the TU grid every year in future. This will enable TU Darmstadt to considerably increase the proportion of thermal energy generated from combined heat and power generation.<\/p>\n<p>\u201cThis is a highly significant project both ecologically and strategically,\u201d highlighted Marie-Luise Wolff-Hertwig, Chair of the Management Board at ENTEGA AG. \u201cBy connecting the TU and ENTEGA heating grids, we are developing the highly energy-efficient heat supply in Darmstadt a crucial step further. E.\u2009g., the Klinikum Darmstadt and local schools will also be connected to the heating grid during the expansion project.\u201d<\/p>\n<p>Thomas Billotet, Member of the Management Board at STEAG New Energies GmbH, said the following when the foundation stone was laid: \u201cThe system is tailored to meet the power, heating and air conditioning requirements at TU Darmstadt. We view this project, set up in partnership with ENTEGA, as an example of how our customers faced with complex challenges can rely on the technical expertise and experience of STEAG New Energies, in order to achieve clear economic advantages and actively reduce CO<sub>2<\/sub> emissions at the same time. By doing so, our customers join us in contributing towards the success of the energy transition and climate protection in Germany.\u201d<\/p>\n<p>The Mayor of Darmstadt, Jochen Partsch, explained: \u201cThe expansion of power facilities on the Lichtwiese campus is another key milestone on the road to a low-emission, decentralised and climate-neutral energy supply in our city. This is where energy efficiency, climate protection, cost savings and the immediate benefits for the people of Darmstadt go hand in hand. A fantastic project which shows how synergy can be achieved by key stakeholders in our city working closely together.\u201d<\/p>\n<p>In the 160 or so buildings belonging to TU Darmstadt, around 56,000 MWh of electricity, 60,000 MWh of heat and 5,000\u00a0MWh of air conditioning were consumed in 2016. Once the entire construction project \u2013 the new building and modernisation \u2013 is complete, CO<sub>2<\/sub> emissions will drop by approximately 9,600 t\/a. (STEAG\/Si.)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A new building is being added to the power facilities at the Technical University of Darmstadt\/Germany. It will house a complex air conditioning system and a highly efficient small-scale combined &hellip;<\/p>\n","protected":false},"author":1,"featured_media":5649,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[519],"tags":[174,526],"class_list":["post-5684","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-in-brief-issue-04_2017","tag-steag-gmbh","tag-tu-darmstadt"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Foundation stone laid for the expansion of power facilities at TU Darmstadt - MINING REPORT<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Foundation stone laid for the expansion of power facilities at TU Darmstadt - MINING REPORT\" \/>\n<meta property=\"og:description\" content=\"A new building is being added to the power facilities at the Technical University of Darmstadt\/Germany. It will house a complex air conditioning system and a highly efficient small-scale combined &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/\" \/>\n<meta property=\"og:site_name\" content=\"MINING REPORT\" \/>\n<meta property=\"article:published_time\" content=\"2017-08-21T12:14:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-08-21T15:34:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2017\/08\/KN_1_STEAG_Grundstein_TU_Darmstadt.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"330\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Redaktion\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redaktion\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"TechArticle\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\\\/\"},\"author\":{\"name\":\"Redaktion\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/32100cccf18bc427e3eb1a0508cd2f1e\"},\"headline\":\"Foundation stone laid for the expansion of power facilities at TU Darmstadt\",\"datePublished\":\"2017-08-21T12:14:28+00:00\",\"dateModified\":\"2017-08-21T15:34:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\\\/\"},\"wordCount\":790,\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2017\\\/08\\\/KN_1_STEAG_Grundstein_TU_Darmstadt.jpg\",\"keywords\":[\"STEAG GmbH\",\"TU Darmstadt\"],\"articleSection\":[\"News in Brief 04_2017\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\\\/\",\"name\":\"Foundation stone laid for the expansion of power facilities at TU Darmstadt - MINING REPORT\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2017\\\/08\\\/KN_1_STEAG_Grundstein_TU_Darmstadt.jpg\",\"datePublished\":\"2017-08-21T12:14:28+00:00\",\"dateModified\":\"2017-08-21T15:34:43+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\\\/#primaryimage\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2017\\\/08\\\/KN_1_STEAG_Grundstein_TU_Darmstadt.jpg\",\"contentUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2017\\\/08\\\/KN_1_STEAG_Grundstein_TU_Darmstadt.jpg\",\"width\":620,\"height\":330,\"caption\":\"Fig. 1. The foundation stone is laid for the new technical building (from left to right): Marie-Luise Wolff-Hertwig, Chair of the Management Board at ENTEGA AG, Jochen Partsch, Mayor of Darmstadt, Prof. Hans J\u00fcrgen Pr\u00f6mel, President of TU Darmstadt, Thomas Billotet, Director at STEAG New Energies, Foreman Stefan B\u00f6hm. \\\/\\\/ Bild 1. Der Grundstein f\u00fcr den Neubau des Technikgeb\u00e4udes ist gelegt (v.l.n.r.): Marie-Luise Wolff-Hertwig, Vorstandsvorsitzende ENTEGA AG, Jochen Partsch, Oberb\u00fcrgermeister von Darmstadt, Prof. Hans J\u00fcrgen Pr\u00f6mel, Pr\u00e4sident der TU Darmstadt, Thomas Billotet, Gesch\u00e4ftsf\u00fchrer der STEAG New Energies, Polier Stefan B\u00f6hm. Photo\\\/Foto: Claus V\u00f6lker (TU Darmstadt)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Foundation stone laid for the expansion of power facilities at TU Darmstadt\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"name\":\"MINING REPORT\",\"description\":\"english Edition\",\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mining-report.de\\\/english\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\",\"name\":\"Mining Report\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"contentUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"width\":830,\"height\":198,\"caption\":\"Mining Report\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/32100cccf18bc427e3eb1a0508cd2f1e\",\"name\":\"Redaktion\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/author\\\/dhollstein\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Foundation stone laid for the expansion of power facilities at TU Darmstadt - MINING REPORT","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/","og_locale":"en_US","og_type":"article","og_title":"Foundation stone laid for the expansion of power facilities at TU Darmstadt - MINING REPORT","og_description":"A new building is being added to the power facilities at the Technical University of Darmstadt\/Germany. It will house a complex air conditioning system and a highly efficient small-scale combined &hellip;","og_url":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/","og_site_name":"MINING REPORT","article_published_time":"2017-08-21T12:14:28+00:00","article_modified_time":"2017-08-21T15:34:43+00:00","og_image":[{"width":620,"height":330,"url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2017\/08\/KN_1_STEAG_Grundstein_TU_Darmstadt.jpg","type":"image\/jpeg"}],"author":"Redaktion","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redaktion","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"TechArticle","@id":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/#article","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/"},"author":{"name":"Redaktion","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/32100cccf18bc427e3eb1a0508cd2f1e"},"headline":"Foundation stone laid for the expansion of power facilities at TU Darmstadt","datePublished":"2017-08-21T12:14:28+00:00","dateModified":"2017-08-21T15:34:43+00:00","mainEntityOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/"},"wordCount":790,"publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/#primaryimage"},"thumbnailUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2017\/08\/KN_1_STEAG_Grundstein_TU_Darmstadt.jpg","keywords":["STEAG GmbH","TU Darmstadt"],"articleSection":["News in Brief 04_2017"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/","url":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/","name":"Foundation stone laid for the expansion of power facilities at TU Darmstadt - MINING REPORT","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/#primaryimage"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/#primaryimage"},"thumbnailUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2017\/08\/KN_1_STEAG_Grundstein_TU_Darmstadt.jpg","datePublished":"2017-08-21T12:14:28+00:00","dateModified":"2017-08-21T15:34:43+00:00","breadcrumb":{"@id":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/#primaryimage","url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2017\/08\/KN_1_STEAG_Grundstein_TU_Darmstadt.jpg","contentUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2017\/08\/KN_1_STEAG_Grundstein_TU_Darmstadt.jpg","width":620,"height":330,"caption":"Fig. 1. The foundation stone is laid for the new technical building (from left to right): Marie-Luise Wolff-Hertwig, Chair of the Management Board at ENTEGA AG, Jochen Partsch, Mayor of Darmstadt, Prof. Hans J\u00fcrgen Pr\u00f6mel, President of TU Darmstadt, Thomas Billotet, Director at STEAG New Energies, Foreman Stefan B\u00f6hm. \/\/ Bild 1. Der Grundstein f\u00fcr den Neubau des Technikgeb\u00e4udes ist gelegt (v.l.n.r.): Marie-Luise Wolff-Hertwig, Vorstandsvorsitzende ENTEGA AG, Jochen Partsch, Oberb\u00fcrgermeister von Darmstadt, Prof. Hans J\u00fcrgen Pr\u00f6mel, Pr\u00e4sident der TU Darmstadt, Thomas Billotet, Gesch\u00e4ftsf\u00fchrer der STEAG New Energies, Polier Stefan B\u00f6hm. Photo\/Foto: Claus V\u00f6lker (TU Darmstadt)"},{"@type":"BreadcrumbList","@id":"https:\/\/mining-report.de\/english\/blog\/foundation-stone-laid-expansion-power-facilities-tu-darmstadt\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mining-report.de\/english\/"},{"@type":"ListItem","position":2,"name":"Foundation stone laid for the expansion of power facilities at TU Darmstadt"}]},{"@type":"WebSite","@id":"https:\/\/mining-report.de\/english\/#website","url":"https:\/\/mining-report.de\/english\/","name":"MINING REPORT","description":"english Edition","publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mining-report.de\/english\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mining-report.de\/english\/#organization","name":"Mining Report","url":"https:\/\/mining-report.de\/english\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/","url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","contentUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","width":830,"height":198,"caption":"Mining Report"},"image":{"@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/32100cccf18bc427e3eb1a0508cd2f1e","name":"Redaktion","url":"https:\/\/mining-report.de\/english\/blog\/author\/dhollstein\/"}]}},"_links":{"self":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/5684","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/comments?post=5684"}],"version-history":[{"count":1,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/5684\/revisions"}],"predecessor-version":[{"id":5685,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/5684\/revisions\/5685"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/media\/5649"}],"wp:attachment":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/media?parent=5684"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/categories?post=5684"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/tags?post=5684"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}