{"id":7038,"date":"2018-06-13T17:59:19","date_gmt":"2018-06-13T15:59:19","guid":{"rendered":"https:\/\/2025.mining-report.de\/english\/?p=7038"},"modified":"2018-06-13T17:59:53","modified_gmt":"2018-06-13T15:59:53","slug":"steag-energy-services-plans-power-station-modernisation-in-montenegro","status":"publish","type":"post","link":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/","title":{"rendered":"STEAG Energy Services plans power station modernisation in Montenegro"},"content":{"rendered":"<p class=\"p1\">Comprehensive modernisation work is planned for the Pljevlja lignite-fired power station, situated approximately 5\u00a0km to the south-west of a town of the same name and near the Serbian border. The renovation will considerably aid an improvement in air quality in the industrial centre of Montenegro. STEAG Energy Services GmbH (SES), Essen\/Germany, is planning this ecological project. German expertise shone through in an international tender process.<\/p>\n<p class=\"p2\">One of the primary tasks is the purification of flue gas by reducing sulphurous substances and nitric oxides in particular. New DeSO<span class=\"s1\"><sub>X<\/sub><\/span> and DeNO<span class=\"s1\"><sub>X<\/sub><\/span> systems will be installed. In addition, the project will involve the optimisation of existing electrostatic precipitators and the wastewater plant, and the remediation of the cooling tower. The tower currently contains asbestos and other substances that must be removed. The thorough modernisation process also involves a series of anti-noise measures. At the same time, the power station will be equipped to generate district heating. The contract, which is worth around 670,000\u00a0<span class=\"s2\">\u20ac<\/span>, also involves conducting an environmental impact assessment, creating tender documentation and answering questions from bidders.<\/p>\n<p class=\"p2\">The contract was signed on 27th March 2018 in Montenegro (Figure 1). The Montenegrin Economic Minister, Dragica Sekuli\u0107, the Minister for Finance, Darko Radunovi\u0107, and the Minister for Sustainable Development and Tourism, Pavle Radulovi\u0107 attended alongside representatives from both the companies involved.\u00a0(STEAG\/Si.)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Comprehensive modernisation work is planned for the Pljevlja lignite-fired power station, situated approximately 5\u00a0km to the south-west of a town of the same name and near the Serbian border. The &hellip;<\/p>\n","protected":false},"author":25,"featured_media":7020,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[600],"tags":[578],"class_list":["post-7038","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-in-brief-issue-03_2018","tag-steag-energy-services-ses"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>STEAG Energy Services plans power station modernisation in Montenegro - MINING REPORT<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"STEAG Energy Services plans power station modernisation in Montenegro - MINING REPORT\" \/>\n<meta property=\"og:description\" content=\"Comprehensive modernisation work is planned for the Pljevlja lignite-fired power station, situated approximately 5\u00a0km to the south-west of a town of the same name and near the Serbian border. The &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/\" \/>\n<meta property=\"og:site_name\" content=\"MINING REPORT\" \/>\n<meta property=\"article:published_time\" content=\"2018-06-13T15:59:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-06-13T15:59:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2018\/06\/KN_01_STEAG_contract_pljevlja.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"330\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Redaktion\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redaktion\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"TechArticle\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/steag-energy-services-plans-power-station-modernisation-in-montenegro\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/steag-energy-services-plans-power-station-modernisation-in-montenegro\\\/\"},\"author\":{\"name\":\"Redaktion\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/50dbf1509042c13292b2b695bfa519a0\"},\"headline\":\"STEAG Energy Services plans power station modernisation in Montenegro\",\"datePublished\":\"2018-06-13T15:59:19+00:00\",\"dateModified\":\"2018-06-13T15:59:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/steag-energy-services-plans-power-station-modernisation-in-montenegro\\\/\"},\"wordCount\":228,\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/steag-energy-services-plans-power-station-modernisation-in-montenegro\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2018\\\/06\\\/KN_01_STEAG_contract_pljevlja.jpg\",\"keywords\":[\"STEAG Energy Services (SES)\"],\"articleSection\":[\"News in Brief 03_2018\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/steag-energy-services-plans-power-station-modernisation-in-montenegro\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/steag-energy-services-plans-power-station-modernisation-in-montenegro\\\/\",\"name\":\"STEAG Energy Services plans power station modernisation in Montenegro - MINING REPORT\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/steag-energy-services-plans-power-station-modernisation-in-montenegro\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/steag-energy-services-plans-power-station-modernisation-in-montenegro\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2018\\\/06\\\/KN_01_STEAG_contract_pljevlja.jpg\",\"datePublished\":\"2018-06-13T15:59:19+00:00\",\"dateModified\":\"2018-06-13T15:59:53+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/steag-energy-services-plans-power-station-modernisation-in-montenegro\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/steag-energy-services-plans-power-station-modernisation-in-montenegro\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/steag-energy-services-plans-power-station-modernisation-in-montenegro\\\/#primaryimage\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2018\\\/06\\\/KN_01_STEAG_contract_pljevlja.jpg\",\"contentUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2018\\\/06\\\/KN_01_STEAG_contract_pljevlja.jpg\",\"width\":620,\"height\":330,\"caption\":\"Fig. 1. Signing the contract for the modernisation of the Pljevlja lignite-fired power station. \\\/\\\/ Bild 1. Vertragsunterzeichnung f\u00fcr die Modernisierung des Braunkohlenkraftwerks Pljevlja. Photo\\\/Foto: STEAG\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/steag-energy-services-plans-power-station-modernisation-in-montenegro\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"STEAG Energy Services plans power station modernisation in Montenegro\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"name\":\"MINING REPORT\",\"description\":\"english Edition\",\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mining-report.de\\\/english\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\",\"name\":\"Mining Report\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"contentUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"width\":830,\"height\":198,\"caption\":\"Mining Report\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/50dbf1509042c13292b2b695bfa519a0\",\"name\":\"Redaktion\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/author\\\/herrwolfgang\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"STEAG Energy Services plans power station modernisation in Montenegro - MINING REPORT","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/","og_locale":"en_US","og_type":"article","og_title":"STEAG Energy Services plans power station modernisation in Montenegro - MINING REPORT","og_description":"Comprehensive modernisation work is planned for the Pljevlja lignite-fired power station, situated approximately 5\u00a0km to the south-west of a town of the same name and near the Serbian border. The &hellip;","og_url":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/","og_site_name":"MINING REPORT","article_published_time":"2018-06-13T15:59:19+00:00","article_modified_time":"2018-06-13T15:59:53+00:00","og_image":[{"width":620,"height":330,"url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2018\/06\/KN_01_STEAG_contract_pljevlja.jpg","type":"image\/jpeg"}],"author":"Redaktion","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redaktion","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"TechArticle","@id":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/#article","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/"},"author":{"name":"Redaktion","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/50dbf1509042c13292b2b695bfa519a0"},"headline":"STEAG Energy Services plans power station modernisation in Montenegro","datePublished":"2018-06-13T15:59:19+00:00","dateModified":"2018-06-13T15:59:53+00:00","mainEntityOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/"},"wordCount":228,"publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/#primaryimage"},"thumbnailUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2018\/06\/KN_01_STEAG_contract_pljevlja.jpg","keywords":["STEAG Energy Services (SES)"],"articleSection":["News in Brief 03_2018"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/","url":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/","name":"STEAG Energy Services plans power station modernisation in Montenegro - MINING REPORT","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/#primaryimage"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/#primaryimage"},"thumbnailUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2018\/06\/KN_01_STEAG_contract_pljevlja.jpg","datePublished":"2018-06-13T15:59:19+00:00","dateModified":"2018-06-13T15:59:53+00:00","breadcrumb":{"@id":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/#primaryimage","url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2018\/06\/KN_01_STEAG_contract_pljevlja.jpg","contentUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2018\/06\/KN_01_STEAG_contract_pljevlja.jpg","width":620,"height":330,"caption":"Fig. 1. Signing the contract for the modernisation of the Pljevlja lignite-fired power station. \/\/ Bild 1. Vertragsunterzeichnung f\u00fcr die Modernisierung des Braunkohlenkraftwerks Pljevlja. Photo\/Foto: STEAG"},{"@type":"BreadcrumbList","@id":"https:\/\/mining-report.de\/english\/blog\/steag-energy-services-plans-power-station-modernisation-in-montenegro\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mining-report.de\/english\/"},{"@type":"ListItem","position":2,"name":"STEAG Energy Services plans power station modernisation in Montenegro"}]},{"@type":"WebSite","@id":"https:\/\/mining-report.de\/english\/#website","url":"https:\/\/mining-report.de\/english\/","name":"MINING REPORT","description":"english Edition","publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mining-report.de\/english\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mining-report.de\/english\/#organization","name":"Mining Report","url":"https:\/\/mining-report.de\/english\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/","url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","contentUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","width":830,"height":198,"caption":"Mining Report"},"image":{"@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/50dbf1509042c13292b2b695bfa519a0","name":"Redaktion","url":"https:\/\/mining-report.de\/english\/blog\/author\/herrwolfgang\/"}]}},"_links":{"self":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/7038","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/comments?post=7038"}],"version-history":[{"count":2,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/7038\/revisions"}],"predecessor-version":[{"id":7040,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/7038\/revisions\/7040"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/media\/7020"}],"wp:attachment":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/media?parent=7038"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/categories?post=7038"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/tags?post=7038"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}