{"id":7530,"date":"2018-10-09T13:42:13","date_gmt":"2018-10-09T11:42:13","guid":{"rendered":"https:\/\/2025.mining-report.de\/english\/?p=7530"},"modified":"2018-10-09T13:42:13","modified_gmt":"2018-10-09T11:42:13","slug":"beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa","status":"publish","type":"post","link":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/","title":{"rendered":"BEUMER Group wins contract for overland conveyor at Knight Hawk Coal facility in Illinois\/USA"},"content":{"rendered":"<p>BEUMER Groups\u2019, Beckum\/Germany, U.S. subsidiary, the BEUMER Corporation, has been awarded a contract to design, supply and install a nearly 6.5 km overland conveyor at Knight Hawk Coal\u2019s Prairie Eagle Mine in Illinois (Figure 1).<\/p>\n<p>The Knight Hawk project is a strategic win for BEUMER, allowing the company to broaden its mining sector footprint, according to Brad Williams, Vice President of Sales and Business Development for BEUMER\u2019s Conveying &amp; Loading Division, based in the Kansas City area. \u201cWe are very accustomed to handling coal and coal residuals in the power industry, but we are excited about the opportunity to focus on a project directly in the coal mining sector,\u201d Williams said.<\/p>\n<p>The curved troughed belt conveyor will carry coal from Knight Hawk\u2019s new underground mine portal to its main coal preparation plant at Prairie Eagle. The overland conveyor will allow Knight Hawk to seal a portion of its underground mine and bring coal to the surface near its current mining activities. Commissioning of the new conveying system is scheduled for April 2019.<\/p>\n<p>\u201cThis project is right up BEUMER\u2019s alley from a technology standpoint, as it will become our third overland curved troughed belt conveyor installed in North America in the last five years,\u201d Williams said. \u201cOur curved conveyor technology allows for a single-flight system that costs less to install and operate than a conventional conveying system, and will offer Knight Hawk long-term financial and environmental benefits when compared with trucking.\u201d<\/p>\n<p>\u201cThe original request for proposal called for four straight conveyors requiring three transfer towers,\u201d Williams explained. BEUMER\u2019s winning proposal features a single-flight curved conveying system that eliminates the cost of tower steel, and greatly reduces the quantity of components and necessary spare parts. It reduces the dust, noise, maintenance and operating costs associated with the transfer points, and offers 98<span style=\"font-family: Microsoft Sans Serif, serif;\">\u2009<\/span>% reliability compared with roughly 92<span style=\"font-family: Microsoft Sans Serif, serif;\">\u2009<\/span>% reliability of four conveyors operating in series.<\/p>\n<p>Prairie Eagle is the hub of Knight Hawk\u2019s coal mining operations, processing and shipping more than 80<span style=\"font-family: Microsoft Sans Serif, serif;\">\u2009<\/span>% of the company\u2019s 5 mt of annual coal production. Opened in 2005 as a surface mine, the Illinois facility was expanded to include two underground mines, Knight Hawk\u2019s primary coal preparation plant, and multiple truck loading facilities. Prairie Eagle is widely recognized as one of the most efficient underground mines in the United States.<\/p>\n<p>Further information:<br \/>\nBEUMER Group GmbH &amp; Co. KG<br \/>\n<a href=\"http:\/\/www.beumergroup.com\" target=\"_blank\" rel=\"noopener\">www.beumergroup.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BEUMER Groups\u2019, Beckum\/Germany, U.S. subsidiary, the BEUMER Corporation, has been awarded a contract to design, supply and install a nearly 6.5 km overland conveyor at Knight Hawk Coal\u2019s Prairie Eagle &hellip;<\/p>\n","protected":false},"author":1,"featured_media":7510,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[620],"tags":[183],"class_list":["post-7530","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news-issue-05_2018","tag-beumer-group"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BEUMER Group wins contract for overland conveyor at Knight Hawk Coal facility in Illinois\/USA - MINING REPORT<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BEUMER Group wins contract for overland conveyor at Knight Hawk Coal facility in Illinois\/USA - MINING REPORT\" \/>\n<meta property=\"og:description\" content=\"BEUMER Groups\u2019, Beckum\/Germany, U.S. subsidiary, the BEUMER Corporation, has been awarded a contract to design, supply and install a nearly 6.5 km overland conveyor at Knight Hawk Coal\u2019s Prairie Eagle &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/\" \/>\n<meta property=\"og:site_name\" content=\"MINING REPORT\" \/>\n<meta property=\"article:published_time\" content=\"2018-10-09T11:42:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2018\/10\/FN_01_BEUMER_Prairie_Eagle_Mine.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"330\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Redaktion\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redaktion\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"TechArticle\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\\\/\"},\"author\":{\"name\":\"Redaktion\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/32100cccf18bc427e3eb1a0508cd2f1e\"},\"headline\":\"BEUMER Group wins contract for overland conveyor at Knight Hawk Coal facility in Illinois\\\/USA\",\"datePublished\":\"2018-10-09T11:42:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\\\/\"},\"wordCount\":411,\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2018\\\/10\\\/FN_01_BEUMER_Prairie_Eagle_Mine.jpg\",\"keywords\":[\"BEUMER Group\"],\"articleSection\":[\"Industry News 05_2018\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\\\/\",\"name\":\"BEUMER Group wins contract for overland conveyor at Knight Hawk Coal facility in Illinois\\\/USA - MINING REPORT\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2018\\\/10\\\/FN_01_BEUMER_Prairie_Eagle_Mine.jpg\",\"datePublished\":\"2018-10-09T11:42:13+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\\\/#primaryimage\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2018\\\/10\\\/FN_01_BEUMER_Prairie_Eagle_Mine.jpg\",\"contentUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2018\\\/10\\\/FN_01_BEUMER_Prairie_Eagle_Mine.jpg\",\"width\":620,\"height\":330,\"caption\":\"Fig. 1. BEUMER Group wins contract for overland conveyor at Knight Hawk Coal facility in Illinois. \\\/\\\/ Bild 1. Die BEUMER Group erh\u00e4lt Auftrag f\u00fcr den Bau einer 6,5 km langen F\u00f6rderanlage in einem der effizientesten Untertagebergwerke der USA. Photo\\\/Foto: BEUMER\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BEUMER Group wins contract for overland conveyor at Knight Hawk Coal facility in Illinois\\\/USA\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"name\":\"MINING REPORT\",\"description\":\"english Edition\",\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mining-report.de\\\/english\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\",\"name\":\"Mining Report\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"contentUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"width\":830,\"height\":198,\"caption\":\"Mining Report\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/32100cccf18bc427e3eb1a0508cd2f1e\",\"name\":\"Redaktion\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/author\\\/dhollstein\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BEUMER Group wins contract for overland conveyor at Knight Hawk Coal facility in Illinois\/USA - MINING REPORT","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/","og_locale":"en_US","og_type":"article","og_title":"BEUMER Group wins contract for overland conveyor at Knight Hawk Coal facility in Illinois\/USA - MINING REPORT","og_description":"BEUMER Groups\u2019, Beckum\/Germany, U.S. subsidiary, the BEUMER Corporation, has been awarded a contract to design, supply and install a nearly 6.5 km overland conveyor at Knight Hawk Coal\u2019s Prairie Eagle &hellip;","og_url":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/","og_site_name":"MINING REPORT","article_published_time":"2018-10-09T11:42:13+00:00","og_image":[{"width":620,"height":330,"url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2018\/10\/FN_01_BEUMER_Prairie_Eagle_Mine.jpg","type":"image\/jpeg"}],"author":"Redaktion","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redaktion","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"TechArticle","@id":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/#article","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/"},"author":{"name":"Redaktion","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/32100cccf18bc427e3eb1a0508cd2f1e"},"headline":"BEUMER Group wins contract for overland conveyor at Knight Hawk Coal facility in Illinois\/USA","datePublished":"2018-10-09T11:42:13+00:00","mainEntityOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/"},"wordCount":411,"publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/#primaryimage"},"thumbnailUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2018\/10\/FN_01_BEUMER_Prairie_Eagle_Mine.jpg","keywords":["BEUMER Group"],"articleSection":["Industry News 05_2018"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/","url":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/","name":"BEUMER Group wins contract for overland conveyor at Knight Hawk Coal facility in Illinois\/USA - MINING REPORT","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/#primaryimage"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/#primaryimage"},"thumbnailUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2018\/10\/FN_01_BEUMER_Prairie_Eagle_Mine.jpg","datePublished":"2018-10-09T11:42:13+00:00","breadcrumb":{"@id":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/#primaryimage","url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2018\/10\/FN_01_BEUMER_Prairie_Eagle_Mine.jpg","contentUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2018\/10\/FN_01_BEUMER_Prairie_Eagle_Mine.jpg","width":620,"height":330,"caption":"Fig. 1. BEUMER Group wins contract for overland conveyor at Knight Hawk Coal facility in Illinois. \/\/ Bild 1. Die BEUMER Group erh\u00e4lt Auftrag f\u00fcr den Bau einer 6,5 km langen F\u00f6rderanlage in einem der effizientesten Untertagebergwerke der USA. Photo\/Foto: BEUMER"},{"@type":"BreadcrumbList","@id":"https:\/\/mining-report.de\/english\/blog\/beumer-group-wins-contract-for-overland-conveyor-at-knight-hawk-coal-facility-in-illinois-usa\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mining-report.de\/english\/"},{"@type":"ListItem","position":2,"name":"BEUMER Group wins contract for overland conveyor at Knight Hawk Coal facility in Illinois\/USA"}]},{"@type":"WebSite","@id":"https:\/\/mining-report.de\/english\/#website","url":"https:\/\/mining-report.de\/english\/","name":"MINING REPORT","description":"english Edition","publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mining-report.de\/english\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mining-report.de\/english\/#organization","name":"Mining Report","url":"https:\/\/mining-report.de\/english\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/","url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","contentUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","width":830,"height":198,"caption":"Mining Report"},"image":{"@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/32100cccf18bc427e3eb1a0508cd2f1e","name":"Redaktion","url":"https:\/\/mining-report.de\/english\/blog\/author\/dhollstein\/"}]}},"_links":{"self":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/7530","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/comments?post=7530"}],"version-history":[{"count":1,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/7530\/revisions"}],"predecessor-version":[{"id":7531,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/7530\/revisions\/7531"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/media\/7510"}],"wp:attachment":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/media?parent=7530"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/categories?post=7530"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/tags?post=7530"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}