{"id":8994,"date":"2019-08-14T17:36:43","date_gmt":"2019-08-14T15:36:43","guid":{"rendered":"https:\/\/2025.mining-report.de\/english\/?p=8994"},"modified":"2019-08-14T17:37:53","modified_gmt":"2019-08-14T15:37:53","slug":"at-the-heart-of-the-process","status":"publish","type":"post","link":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/","title":{"rendered":"At the heart of the process"},"content":{"rendered":"<p>Basalt production has increased by 20\u2009% since Vogelsberger Basaltwerk modernized its processing plant by installing a new high-reduction secondary crusher.<\/p>\n<p>60 km northeast of Frankfurt in south-western Germany, Vogelsberger Basaltwerk GmbH &amp; Co. KG (VBW) extracts basalt from a 19 million year old formation beneath the Vogelsberg mountain range, Central Europe\u2019s largest contiguous volcanic region (Figure 1). VBW produces gravel, stone, sand and other raw materials primarily used as aggregate for asphalt and concrete. As demand for the company\u2019s basalt products has increased over the years, so have the strains on its all-important processing plant.<\/p>\n<p>After more than 30 years of secondary stage service, VBW\u2019s S1650 cone crusher had reached its capacity limits by 2016. Managing Director Bernd Krempel and -Dieter Pracht, operations manager for VBW, researched a replacement with a higher reduction ratio, a crusher that would not only increase capacity but also improve product quality.<\/p>\n<p>VBW initially intended to replace the outdated S1650 with a Sandvik CH-series cone crusher, which would have required a reduction in both feed size and overall throughput.<\/p>\n<p>Sandvik soon announced the launch of Sandvik CS550, and the new crusher\u2019s design immediately impressed Krempel and Pracht. \u201cIt\u2019s basically a hybrid of assessed models, a flat cone crusher and gyratory crusher,\u201d Krempel says. Capable of operating at higher pressures than other Sandvik CS-series crushers and featuring proven components from Sandvik CH-series models, Sandvik CS550 seemed to be the ideal solution for VBW.<\/p>\n<p>Sandvik ran process simulations in September 2016 with its PlantDesigner software, using VBW\u2019s real-life figures for work index, basalt moisture, bulk density and clay percentage. \u201cThat simulation process was very important for us,\u201d Krempel says. \u201cThe competence of our contacts at the company helped convince us.\u201d<\/p>\n<p>Despite having been convinced of the new crusher\u2019s suitability for his operation, Krempel admits he still had nerves about being the first Sandvik CS550 user. VBW commissioned its Sandvik CS550 in February 2017 and soon saw a notable increase in the plant\u2019s throughput capacity (Figure 2).<\/p>\n<figure id=\"attachment_8993\" aria-describedby=\"caption-attachment-8993\" style=\"width: 620px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/2025.mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2019\/08\/FN_02_Sandvik_CS50.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-8993\" src=\"https:\/\/2025.mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2019\/08\/FN_02_Sandvik_CS50.jpg\" alt=\"\" width=\"620\" height=\"330\" srcset=\"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2019\/08\/FN_02_Sandvik_CS50.jpg 620w, https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2019\/08\/FN_02_Sandvik_CS50-300x160.jpg 300w, https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2019\/08\/FN_02_Sandvik_CS50-600x319.jpg 600w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/a><figcaption id=\"caption-attachment-8993\" class=\"wp-caption-text\">Fig. 2. Vogelsberger Basaltwerk commissioned its Sandvik CS550 in February 2017 and soon saw a notable increase in the plant\u2019s throughput capacity. Photo: Sandvik<\/figcaption><\/figure>\n<p>\u201cThe biggest advantage, and the one we hoped to have, is the high reduction ratio, and the smoother running of the process,\u201d Pracht says. \u201cWe can now achieve higher performance with the downstream pressure because we have less return flow. And in contrast to competitors\u2019 products, it has the largest possible intake.\u201d Less recirculation resulted in reduced wear and less downtime.<\/p>\n<p>\u201cThe costs fell, both with the actual crusher and with the downstream components like our gyratory crusher for producing double-broken chippings,\u201d Krempel says. \u201cBecause we\u2019re able to supply it with smaller pieces, the costs in wear and in electricity have significantly decreased,\u201d he says.<\/p>\n<p>Sandvik CS550 features a redesigned crushing chamber to ensure improved product quality. VBW feeds 250 to 300 t\/h of 250 to 350 mm primary crushed material into the crusher\u2019s C-chamber intake. More than 80\u2009% is processed to VBW\u2019s preferred particle size of &lt; 32 mm.<\/p>\n<p>Pracht says Sandvik CS550\u2019s control system has major advantages over its retired predecessor. It only takes a few simple steps to adjust the crusher to different grain sizes. \u201cCompared to the old crusher, we now have much more flexibility,\u201d he says. \u201cWe can adjust our processes more quickly to meet the needs of our clients and to meet demand. We bought the CS550 in order to produce finer aggregates. But at the press of a button, we can adjust the cone, and we have coarser material immediately. There is nothing better on the market right now.\u201d<\/p>\n<p>After more than two years of operation, the crusher\u2019s reliability remains as vital for VBW as its productivity.<\/p>\n<p>With its Sandvik CS550 at the center of a more productive processing plant, VBW has shifted its focus to exploring other potential optimization opportunities. Its primary crusher, e.\u2009g., can barely keep the new Sandvik crusher 50\u2009% fed despite operating at its performance limits.<\/p>\n<p>Despite the primary stage bottleneck, VBW has increased basalt production by 20\u2009% since installing Sandvik CS550, even operating the crusher at the smallest possible throw of 24 mm.<\/p>\n<p>Further information:<br \/>\nSandvik Mining &amp; Rock Technology<br \/>\n<a href=\"https:\/\/www.rocktechnology.sandvik\/\" target=\"_blank\" rel=\"noopener noreferrer\">www.rocktechnology.sandvik<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Basalt production has increased by 20\u2009% since Vogelsberger Basaltwerk modernized its processing plant by installing a new high-reduction secondary crusher. 60 km northeast of Frankfurt in south-western Germany, Vogelsberger Basaltwerk &hellip;<\/p>\n","protected":false},"author":25,"featured_media":8992,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[676],"tags":[528,588],"class_list":["post-8994","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news-issue-04_2019","tag-sandvik","tag-sandvik-ab"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>At the heart of the process - MINING REPORT<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"At the heart of the process - MINING REPORT\" \/>\n<meta property=\"og:description\" content=\"Basalt production has increased by 20\u2009% since Vogelsberger Basaltwerk modernized its processing plant by installing a new high-reduction secondary crusher. 60 km northeast of Frankfurt in south-western Germany, Vogelsberger Basaltwerk &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/\" \/>\n<meta property=\"og:site_name\" content=\"MINING REPORT\" \/>\n<meta property=\"article:published_time\" content=\"2019-08-14T15:36:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-08-14T15:37:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2019\/08\/FN_01_Vogelsberger_Basaltwerk_Sandvik.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"330\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Redaktion\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redaktion\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"TechArticle\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/at-the-heart-of-the-process\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/at-the-heart-of-the-process\\\/\"},\"author\":{\"name\":\"Redaktion\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/50dbf1509042c13292b2b695bfa519a0\"},\"headline\":\"At the heart of the process\",\"datePublished\":\"2019-08-14T15:36:43+00:00\",\"dateModified\":\"2019-08-14T15:37:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/at-the-heart-of-the-process\\\/\"},\"wordCount\":707,\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/at-the-heart-of-the-process\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2019\\\/08\\\/FN_01_Vogelsberger_Basaltwerk_Sandvik.jpg\",\"keywords\":[\"Sandvik\",\"Sandvik AB\"],\"articleSection\":[\"Industry News 04_2019\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/at-the-heart-of-the-process\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/at-the-heart-of-the-process\\\/\",\"name\":\"At the heart of the process - MINING REPORT\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/at-the-heart-of-the-process\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/at-the-heart-of-the-process\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2019\\\/08\\\/FN_01_Vogelsberger_Basaltwerk_Sandvik.jpg\",\"datePublished\":\"2019-08-14T15:36:43+00:00\",\"dateModified\":\"2019-08-14T15:37:53+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/at-the-heart-of-the-process\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/at-the-heart-of-the-process\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/at-the-heart-of-the-process\\\/#primaryimage\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2019\\\/08\\\/FN_01_Vogelsberger_Basaltwerk_Sandvik.jpg\",\"contentUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2019\\\/08\\\/FN_01_Vogelsberger_Basaltwerk_Sandvik.jpg\",\"width\":620,\"height\":330,\"caption\":\"Fig. 1. Vogelsberger Basaltwerk in south-western Germany produces gravel, stone, sand and other raw materials primarily used as aggregate for asphalt and concrete. Photo: Sandvik\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/at-the-heart-of-the-process\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"At the heart of the process\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#website\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"name\":\"MINING REPORT\",\"description\":\"english Edition\",\"publisher\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mining-report.de\\\/english\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#organization\",\"name\":\"Mining Report\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"contentUrl\":\"https:\\\/\\\/mining-report.de\\\/english\\\/wp-content\\\/uploads\\\/sites\\\/3\\\/2015\\\/05\\\/logo-mning-report.jpg\",\"width\":830,\"height\":198,\"caption\":\"Mining Report\"},\"image\":{\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mining-report.de\\\/english\\\/#\\\/schema\\\/person\\\/50dbf1509042c13292b2b695bfa519a0\",\"name\":\"Redaktion\",\"url\":\"https:\\\/\\\/mining-report.de\\\/english\\\/blog\\\/author\\\/herrwolfgang\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"At the heart of the process - MINING REPORT","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/","og_locale":"en_US","og_type":"article","og_title":"At the heart of the process - MINING REPORT","og_description":"Basalt production has increased by 20\u2009% since Vogelsberger Basaltwerk modernized its processing plant by installing a new high-reduction secondary crusher. 60 km northeast of Frankfurt in south-western Germany, Vogelsberger Basaltwerk &hellip;","og_url":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/","og_site_name":"MINING REPORT","article_published_time":"2019-08-14T15:36:43+00:00","article_modified_time":"2019-08-14T15:37:53+00:00","og_image":[{"width":620,"height":330,"url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2019\/08\/FN_01_Vogelsberger_Basaltwerk_Sandvik.jpg","type":"image\/jpeg"}],"author":"Redaktion","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redaktion","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"TechArticle","@id":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/#article","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/"},"author":{"name":"Redaktion","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/50dbf1509042c13292b2b695bfa519a0"},"headline":"At the heart of the process","datePublished":"2019-08-14T15:36:43+00:00","dateModified":"2019-08-14T15:37:53+00:00","mainEntityOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/"},"wordCount":707,"publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/#primaryimage"},"thumbnailUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2019\/08\/FN_01_Vogelsberger_Basaltwerk_Sandvik.jpg","keywords":["Sandvik","Sandvik AB"],"articleSection":["Industry News 04_2019"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/","url":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/","name":"At the heart of the process - MINING REPORT","isPartOf":{"@id":"https:\/\/mining-report.de\/english\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/#primaryimage"},"image":{"@id":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/#primaryimage"},"thumbnailUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2019\/08\/FN_01_Vogelsberger_Basaltwerk_Sandvik.jpg","datePublished":"2019-08-14T15:36:43+00:00","dateModified":"2019-08-14T15:37:53+00:00","breadcrumb":{"@id":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/#primaryimage","url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2019\/08\/FN_01_Vogelsberger_Basaltwerk_Sandvik.jpg","contentUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2019\/08\/FN_01_Vogelsberger_Basaltwerk_Sandvik.jpg","width":620,"height":330,"caption":"Fig. 1. Vogelsberger Basaltwerk in south-western Germany produces gravel, stone, sand and other raw materials primarily used as aggregate for asphalt and concrete. Photo: Sandvik"},{"@type":"BreadcrumbList","@id":"https:\/\/mining-report.de\/english\/blog\/at-the-heart-of-the-process\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mining-report.de\/english\/"},{"@type":"ListItem","position":2,"name":"At the heart of the process"}]},{"@type":"WebSite","@id":"https:\/\/mining-report.de\/english\/#website","url":"https:\/\/mining-report.de\/english\/","name":"MINING REPORT","description":"english Edition","publisher":{"@id":"https:\/\/mining-report.de\/english\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mining-report.de\/english\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mining-report.de\/english\/#organization","name":"Mining Report","url":"https:\/\/mining-report.de\/english\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/","url":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","contentUrl":"https:\/\/mining-report.de\/english\/wp-content\/uploads\/sites\/3\/2015\/05\/logo-mning-report.jpg","width":830,"height":198,"caption":"Mining Report"},"image":{"@id":"https:\/\/mining-report.de\/english\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/mining-report.de\/english\/#\/schema\/person\/50dbf1509042c13292b2b695bfa519a0","name":"Redaktion","url":"https:\/\/mining-report.de\/english\/blog\/author\/herrwolfgang\/"}]}},"_links":{"self":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/8994","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/comments?post=8994"}],"version-history":[{"count":1,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/8994\/revisions"}],"predecessor-version":[{"id":8995,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/posts\/8994\/revisions\/8995"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/media\/8992"}],"wp:attachment":[{"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/media?parent=8994"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/categories?post=8994"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mining-report.de\/english\/wp-json\/wp\/v2\/tags?post=8994"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}