Fig. 9. A stabilising element in advance was the collapse of gravel onto the mass level already located in the deepest shaft, which was intended to support the contour of the fracture area and, above all, to provide an even, full-surface working plane. Photo: SBN
Home » Solution Concepts for Mining and Geomechanical Challenges Involved in Safe Long-Term Closure of the Saale Shaft in the Teutschenthal Mine » SBN_09_Schacht_Saale_Kies_Verstuerzung_Stabilisierung