It is quite hot inside the Graf Moltke waste dump. Temperatures of up to 450 °C have been measured at times. The reason for this is a smouldering fire that RAG Aktiengesellschaft, Essen/Germany, has been tackling with extensive clean-up measures since 2022. Now the second construction phase is beginning – as part of the final operation plan (Figure 1). After completion ...
Read More »